Submissions closed
← Find my ward
04

Howick

Local boards: Howick

Switch ward
A · Map of proposed changes
  1. 1. Search your address in the official viewer.
  2. 2. Compare "operative" vs "proposed" zoning for your parcel.
  3. 3. Screenshot your property for your own records, attach it when you lodge.

Council maps are the authority. If this guide and the official map disagree, the official map wins.

Ward map notes · Howick
  • Intensification hotspots: Botany and Howick centres; Eastern Busway stops if inside mandated catchments.
  • Pulled back in July 2026: Local-centre extras (Botany Junction and others) reported as removed.
  • Hazards: Coastal inundation and cliff instability along the coastline.
B · Impact of the changes in Howick

What is proposed to change here

Botany and Howick centres; Eastern Busway stops if inside mandated catchments. Local-centre extras (Botany Junction and others) reported as removed.

What is proposed to stay the same

About 85% of the urban area stays on existing Unitary Plan zoning. Most suburban streets in Howick revert to or remain on their current zone.

Hazard overlay impact

Coastal inundation and cliff instability along the coastline. High-risk flood, landslide, coastal erosion and inundation areas face downzoning or highly restricted new development. Some hazard rules already have legal effect under RMA s86B(3), check the official explanatory note. Check your own parcel on the official map.

Likely effects to address in a submission

  • Infrastructure capacity, wastewater, stormwater, roads, schools.
  • Hazard risk to people and property (flood, slip, coastal).
  • Walkable access to rapid transit.
  • Special character / heritage as a qualifying matter (only with mapped streets).
  • Urban design, bulk, dominance, shading.
  • Three waters and overland flow paths.

Theoretical capacity is not "buildings that will be built next year". Market, infrastructure funding and consenting still decide what gets built.

C · What a high-impact local submission looks like here

Examples for Howick, not copy-paste dogma. Adapt them to your street and what you saw on the official map.

  • 01Centre interfaces and height at Botany / Howick.
  • 02Eastern Busway walkable catchments.
  • 03Coastal hazard mapping accuracy.

Build your submission

The survey pre-fills with Howick. It takes 10-15 minutes. Your answers stay in your browser only.

Start survey for Howick
PC120 Submission Guide

A practical RMA submission workshop for Aucklanders. Not a petition, not a campaign, not legal advice. You paste the result into Council's official form.

About this tool

Last reviewed 19 October 2026. Not affiliated with Auckland Council. Friends of Submitters is a separate, independent free service, this tool does not replace it.

General information and opinion, not legal, financial or planning advice. Spot an error? See our corrections policy.

© 2026 City Builders Association · Friends of Submitters is independent and free