Howick
Local boards: Howick
- 1. Search your address in the official viewer.
- 2. Compare "operative" vs "proposed" zoning for your parcel.
- 3. Screenshot your property for your own records, attach it when you lodge.
Council maps are the authority. If this guide and the official map disagree, the official map wins.
- Intensification hotspots: Botany and Howick centres; Eastern Busway stops if inside mandated catchments.
- Pulled back in July 2026: Local-centre extras (Botany Junction and others) reported as removed.
- Hazards: Coastal inundation and cliff instability along the coastline.
What is proposed to change here
Botany and Howick centres; Eastern Busway stops if inside mandated catchments. Local-centre extras (Botany Junction and others) reported as removed.
What is proposed to stay the same
About 85% of the urban area stays on existing Unitary Plan zoning. Most suburban streets in Howick revert to or remain on their current zone.
Hazard overlay impact
Coastal inundation and cliff instability along the coastline. High-risk flood, landslide, coastal erosion and inundation areas face downzoning or highly restricted new development. Some hazard rules already have legal effect under RMA s86B(3), check the official explanatory note. Check your own parcel on the official map.
Likely effects to address in a submission
- Infrastructure capacity, wastewater, stormwater, roads, schools.
- Hazard risk to people and property (flood, slip, coastal).
- Walkable access to rapid transit.
- Special character / heritage as a qualifying matter (only with mapped streets).
- Urban design, bulk, dominance, shading.
- Three waters and overland flow paths.
Theoretical capacity is not "buildings that will be built next year". Market, infrastructure funding and consenting still decide what gets built.
Examples for Howick, not copy-paste dogma. Adapt them to your street and what you saw on the official map.
- 01Centre interfaces and height at Botany / Howick.
- 02Eastern Busway walkable catchments.
- 03Coastal hazard mapping accuracy.
Build your submission
The survey pre-fills with Howick. It takes 10-15 minutes. Your answers stay in your browser only.
Start survey for Howick