Performing Arts / Multi-Use Hall Concept

Wesley Intermediate and Mt Roskill communities

A local group has engaged the City Builders Association to design a concept for a community-oriented multi-use hall at Wesley Intermediate. The hall is intended to work as a school hall, indoor sports space and performing-arts centre. Education use has priority during the school day. Outside those hours the space is for local groups, clubs, cultural activities and residents across Mt Roskill and surrounding areas.

This is an early concept. Nothing has been designed in detail, costed or formally lodged. Progress is tracked openly.

What is this?

A local group has engaged the City Builders Association to design a concept for a community-oriented multi-use hall at Wesley Intermediate. The hall is intended to work as a school hall, indoor sports space and performing-arts centre.

Concept statement

The proposal is for a flexible hall on the Wesley Intermediate site that can serve multiple schools during the day and open to community use for indoor sport, performing arts, cultural events and gatherings. The aim is better use of an existing school site and more places for people in Mt Roskill and nearby areas to be active and come together. Design and management will follow clear rules so school needs stay protected while community access is straightforward.

How the space works

One hall can do many jobs. Division curtains, retractable basketball goals and retractable seating let the same floor change from three courts for school and club sport to a seated venue for performances, assemblies and community events. The four modes below show how one space could serve schools by day and the wider Mt Roskill community after hours.

Mode 1: Three basketball courts

The full floor is clear for three courts side by side. Division curtains are open or lightly dividing, the retractable goals are down and the seating is stored, so school classes, club training and community games can run at the same time.

Mode 2: Two courts and a practice zone

One division curtain is closed. Two full courts stay active while the remaining zone is used for practice, warm-ups, skills sessions or a smaller group, so different users can share the hall without getting in each other's way.

Mode 3: Match mode with spectator seating

Retractable seating is extended along one side for families and supporters, with one or two courts in use. This suits tournaments, school sports days and local league fixtures.

Mode 4: Performance and assembly mode

The goals are retracted, seating is extended and a portable stage sits at one end. Acoustic curtains form a proscenium and theatrical lighting turns the hall into a venue for school productions, kapa haka, concerts, cultural celebrations and community gatherings.

A cost-effective prefabricated hall

These three views show the same simple building: a prefabricated steel portal frame on a concrete slab. A plain, durable shell keeps costs down, while retractable seating, division separators and blackout curtains let one hall move between sport, performances and community events.

Conceptual illustration of a prefabricated steel portal-frame hall with an open timber floor, seating retracted and large windows

Open floor: three courts

Seats are fully retracted against the walls, leaving a plain light timber floor for up to three courts. Division separators can be lowered to split the floor, and large windows bring in daylight for school and community sport.

Conceptual illustration of a prefabricated steel portal-frame hall set up for a performance with a stage, blackout curtains and U-shaped seating

Performance: stage and U-shaped seating

A large stage sits at one end, blackout curtains cover the side windows and retractable seating is extended in a U shape, with the plain floor kept clear in front of the stage. The same hall becomes a venue for school productions, concerts and cultural events.

Conceptual illustration looking from the stage into a prefabricated steel portal-frame hall with U-shaped seating filled with an audience

View from the stage

Looking out from the stage, the full U-shaped seating wraps around the plain floor, so performers and audience stay close together in the same building used for sport during the day.

These are conceptual illustrations only. They show how a multi-use hall of this kind could work and are not site-specific designs for Wesley Intermediate.

Cost-effective nature of this type of build

Thinking Big, multi-use hall concept (reference only)

A prefabricated steel portal-frame hall on a concrete slab is a widely used, cost-effective way to enclose a large single-storey space such as a multi-use sports and community hall. The figures below are reference figures from named, published sources. They are not a cost estimate for Wesley Intermediate.

Key cost advantages

  • Lower structural cost: UK steel-industry cost guidance describes portal frames as a highly cost-effective way to enclose a large single-storey space, and notes that their light weight can reduce the size of the foundations needed. In one UK warehouse comparison, a precast concrete and glulam alternative cost 12% more overall than a steel portal frame. Savings depend on the project, and some published studies have found precast concrete cheaper, so no fixed percentage saving is claimed here. (Source: steelconstruction.info, "Cost planning for steel framed industrial buildings", citing the Target Zero study.)
  • Faster construction: Prefabrication shortens site time. A New Zealand supplier of enclosed multi-purpose halls quotes approximately 12 weeks on site (Source: Creo Space, supplier claim). UK industry guidance notes quicker frame erection because prefabricated, repetitive elements arrive ready to assemble, which can also reduce finance and preliminary costs (Source: steelconstruction.info).
  • Scalable and modular: The same system can be sized for one, two or three courts and later extended. Fit-out (flooring, seating, stage, curtains, lighting) is added separately, so the base building can be kept simple.

Published reference costs

New Zealand: Creo Space multi-purpose sports halls (supplier pricing)

  • Single-court hall (33 m x 18 m, about 630 m²): fully enclosed from $630,000 + GST; semi-enclosed from $540,000 + GST.
  • Double-court hall (33 m x 36 m, about 1,260 m²): fully enclosed from $1.2 million + GST; semi-enclosed from $1.02 million + GST.

The supplier states these are around 45% less than a traditional gym (supplier claim). The base build includes asphalt surfacing, with lighting, a stage and other items available as optional extras. Cladding is Coloursteel and/or Webglass. (Source: Creo Space, creospace.co.nz/multi-purpose-sports-hall, accessed 16 Nov 2026.)

United Kingdom: Sport England Affordable Sports Halls (capital cost guidance)

  • 4-court hall (34.5 m x 20 m, 1,532 m² gross internal floor area): £3,005,000 at 3Q2025, including external works and professional fees, excluding VAT, land and inflation after 3Q2025. (Source: Sport England, Facility Costs 3Q2025 Revision 1.)

United Kingdom: steel portal frame cost (frame only)

  • Large-span single-storey building, low eaves (6 to 8 m): £114 to £149 per m² of gross internal floor area.
  • High eaves (10 to 13 m): £139 to £178 per m².

These are for the steel frame only (excluding cladding rails and purlins), at Q3 2025 UK prices. Cladding, foundations, floor, services and fit-out are extra. (Source: steelconstruction.info, "Cost planning for steel framed industrial buildings", indicative cost ranges Q3 2025.)

Costs rise with larger clear spans, greater height, insulation, heating and ventilation, sports flooring, seating and stage equipment. Overseas figures are shown in their original currency and have not been converted.

What this means for the concept

A three-court multi-use hall of the type illustrated (prefab steel portal frame, concrete slab, large windows, U-shaped seating, convertible stage) fits the cost-effective category. The base structure can be kept relatively simple; the convertible equipment (retractable seating, portable stage, division curtains, blackout curtains) is added as fit-out. This supports the community-oriented goal of delivering usable indoor sport and performance space without the cost of a larger, more complex conventional sports centre.

All figures are reference only. No quantity survey or site-specific costing has been done for Wesley Intermediate. Actual cost will depend on exact dimensions, clear height, foundation conditions, insulation and acoustic requirements, Ministry of Education and Building Code standards, and the level of stage, seating and services specified.

Sources

  1. Creo Space, "Multi-purpose sports hall", https://creospace.co.nz/multi-purpose-sports-hall/ (supplier; accessed 16 Nov 2026)
  2. Sport England, "Facility Costs 3Q2025 Revision 1", via Sport England Facility cost guidance; copy at https://programmeofficers.co.uk/Woodford/CoreDocuments/CD11/11.20%20Sport%20England%20cost%20facilities%20(compiled%20documents)%C2%A0.pdf
  3. steelconstruction.info (BCSA, SCI and Steel for Life), "Cost planning for steel framed industrial buildings", https://steelconstruction.info/topics/cost-of-structural-steelwork/cost-planning-industrial-buildings/ (cost table Q3 2025; accessed 16 Nov 2026)

Reference figures only. These are not a cost estimate for Wesley Intermediate, and the illustrations above are conceptual only, not site-specific designs.

Stage tracker

Progress

Status checked 16 November 2026

  1. Stage 1

    Concept confirmation

    In progress – CBA engaged by local group

    Next: Lock internal concept note and publish this page

  2. Stage 2

    Hearing from people

    Not started

    Next: Opt-in questions on how groups would use the space

  3. Stage 3

    Partnerships and rules

    Not started

    Next: Contact school board, Ministry of Education and Local Board only after confirmation

  4. Stage 4

    Feasibility and funding

    Not started

    Next: Check funding options against official rules

  5. Stage 5

    Consents and agreements

    Not started

    Next: Formal agreements that lock education priority and community access

  6. Stage 6

    Delivery and review

    Not started

    Next: Build, operate and report on use

Current stage
Stage 1 of 6: Concept confirmation
Location
Wesley Intermediate and Mt Roskill communities
Led by
City Builders Association Limited
Category
Community facility

How to take part

Tell us how you or your group might use a multi-use hall at Wesley Intermediate. Responses are opt-in and used only to refine the concept. They are not a petition or a formal submission.

Expression of interest

Tell the Association who you are and how you would use the concept.

Short survey

Select the options that apply to you.

Which of these apply to you? *

Reference material

  • Puketāpapa Sport and Active Recreation Facilities Plan (October 2024) – indoor court shortfalls and Wesley suitability.
  • Ministry of Education funding and occupancy rules (Education and Training Act 2020, sections 160, 162 and 163).
  • Joint-use design principles (separate community entrance, flexible main space, storage, adult facilities) from Sport England, Western Australian and NSW education guides.
  • International cost examples (reference only – not estimates for this project).

Reference only. These summaries are not a design, consent or compliance assessment for Wesley Intermediate. They record what each named source says, as published, so readers can check it. Any design, consent or agreement would need its own professional assessment and the approval of the bodies named in the stage tracker.

Auckland Unitary Plan H29 Special Purpose – School Zone review

Source: Auckland Unitary Plan Operative in part, Chapter H29 Special Purpose – School Zone. Auckland Council. Version shown: "Auckland Unitary Plan July 2026". unitaryplan.aucklandcouncil.govt.nz

Which rules apply to the Wesley Intermediate site. H29.1 says the School Zone applies to Auckland's independent and integrated schools, and refers readers to Chapter K: Designations for Ministry of Education owned sites. Wesley Intermediate is listed in the Minister of Education designation schedule as Designation 4795 (766–778 Sandringham Road Extn, Mt Roskill, including 17 William Blofield Avenue and 59 and 61 Denny Avenue). So the H29 rules below are a reference for how the Unitary Plan treats community use of school facilities. The designation, summarised after them, is the planning instrument recorded for this site.

What H29 says about community use

  • Objective H29.2(3): "Opportunities for communities to use school facilities, and for the co-location of school and community facilities are provided."
  • Policy H29.3(3): enable community use of school land, buildings and infrastructure, and co-location of school and community facilities, provided they do not compromise the use of the zone for school activities and they avoid, remedy or mitigate adverse effects on adjoining properties.
  • Activity table H29.4.1 lists as permitted (P): community facilities (A5), community use of education facilities (A6), education facilities (A7), organised sport and recreation (A10), recreation facilities (A12), and new buildings, additions and alterations unless otherwise specified (A15).
  • Restricted discretionary (RD), (A16): new buildings or additions that increase the building footprint by more than 20 per cent and are visible from and within 10m of a public road or an open space zone. Council's discretion is limited to the effects of building design and external appearance on the streetscape and adjoining open space (H29.8.1).

H29 building standards (H29.6), as published

  • Height: 12m for buildings less than 20m from a boundary with a residential zone (other than Terrace Housing and Apartment Buildings), open space zone or Future Urban Zone; 16m elsewhere. The table carries a note that Plan Change 120 text is still to be inserted.
  • Yards: 3m front yard, 3m side and rear yards where they adjoin a residential, open space or Future Urban zone; 5m riparian yard.
  • Building coverage: no more than 50 per cent. Impervious area: no more than 70 per cent.
  • Height in relation to boundary: 45-degree recession plane from 3m above ground at boundaries with residential zones (other than Terrace Housing and Apartment Buildings), rural zones or the Future Urban Zone.
  • H29 has no specific noise or hours-of-use standard.

Designation 4795, Wesley Intermediate (Chapter K)

Source: Auckland Unitary Plan Operative in part, Chapter K Designations, Minister of Education designation schedule. Auckland Council. Version shown: "Auckland Unitary Plan July 2026". unitaryplan.aucklandcouncil.govt.nz

  • Requiring authority: Minister of Education. Purpose: "Educational purposes - primary school (years 0 - 8) and may include early childhood education (preschool), and Central Auckland Specialist School (years 1-13)." The standard conditions for all Minister of Education designations apply, plus site-specific conditions for the Central Auckland Specialist School.
  • The standard conditions' explanatory notes say "educational purposes" includes community education (for example night classes for adults) outside school hours, sporting and cultural activities "whether carried out during or outside school hours", and school assemblies, functions, fairs and other gatherings during or outside school hours. The schedule does not say whether wider community or club use is covered. That would need to be confirmed with the requiring authority and Auckland Council.
  • The standard noise condition sets limits measured at residentially zoned sites, assessed under NZS 6801:2008 and NZS 6802:2008. It states that the limits "do not apply to noise from school sports and school recreational activities occurring between 8am and 6pm Monday to Saturday".
  • Other standard conditions cover height in relation to boundary, on-site car parking (two carparks per new classroom or classroom equivalent, unless a parking study supports less), scheduled trees and outline plans of works.

Joint-use design standards (MoE DSNZ, DQLS Acoustics, Sport England, NSW)

Designing Schools in Aotearoa New Zealand (DSNZ), School Property Design Standards. New Zealand School Property Agency (NZSPA), March 2026. schoolproperty.govt.nz

  • Following NZSPA's design principles and standards is mandatory for all new work on state school property that learners may use, "regardless of who owns the property or funds a project". School or community projects not intended for learning must meet DSNZ site planning priorities and standards and be approved by NZSPA.
  • Section 2.12.7 Multipurpose Halls: halls are used for "performance, assemblies, ceremonies, cultural events, physical activity, and community use". Designers are to consider how the facility can support out-of-hours community use, and to ensure "the design prioritises school activities over community activities", there is a high-quality connection to an appropriately sized covered entry, adequate support spaces and services are provided, and halls are near the public interface of a school.
  • Section 2.2.2: facilities with cultural or community uses "must be adjacent to the main public entry points of a school". Section 2.4 asks that "entryways for community, whānau and learners are together, not separated".
  • Section 2.12.8 and Table 20: indoor courts are dimensioned to community sport standards, with a largest court requirement of 30.5m x 15.25m and an overall clear area of 34.5m x 19.1m including run-off.

Designing Quality Learning Spaces (DQLS): Acoustics. NZSPA. Version 3.1, December 2020, with the DQLS Acoustics Amendment effective from May 2024. DQLS page

  • NZSPA states that complying with DQLS is mandatory. It applies to new-build structures including extensions, prefabricated and new modular buildings, and refurbishments of existing school buildings, including significant alterations. Compliance is shown through an Internal Environmental Quality (IEQ) Design Report.
  • The May 2024 amendment lists "Multipurpose halls", "Drama studios" and "Auditoria" as needing specialist acoustic design. Its approved wall solution between gyms, assembly halls or auditoria and other spaces is rated STC 60.
  • Section 2.7.3 of Version 3.1: where an assembly hall or gym also serves as a performance space, follow the mandatory requirements and, where possible, apply the most stringent values based on its range of uses. An acoustic engineer should be engaged early.

Sport England, Sports Halls Design and Layouts (Updated and Combined Guidance). Sport England, Revision 005, February 2012. PDF

  • "In dual-use centres it is preferable to separate the main community entrance from the school entrance." The guide notes that dual-use projects can affect heating and ventilation strategy, escape routes and examination requirements. (DSNZ section 2.4, above, takes a different approach for state schools in New Zealand: shared entryways.)

Sport England, Use Our School. Sport England, date not shown, accessed 14 Nov 2026. sportengland.org

  • A free resource to help schools open their facilities to the community in evenings, at weekends and during holidays. It recommends a community use agreement setting out hours of availability, management arrangements and pricing policy. It also covers risk management, safeguarding checks on hirers, and zoning heating and lighting so the whole site does not need to be heated or lit.

NSW Department of Education, Sharing of school facilities policy and procedures. Policy PD-2009-0400 (V05.1.0) and procedures PD-2009-0400-01 (V03.2.0), both last updated 30 April 2026. Policy and procedures

  • Policy statement: "Schools are valuable community assets that should be available for community use, formal and informal, when not required for school purposes."
  • The procedures define a joint use agreement (the department and other parties invest significantly in building, upgrading or maintaining facilities and share the asset over its lifetime) and a shared use agreement (existing facilities shared outside school hours for a licence fee). Such projects "must place the school's needs above those of the proposed user". Agreements set out management structures, financial arrangements, legal matters, maintenance obligations, and design and construction considerations.

Western Australia. Department of Education, Community Use of Public School Facilities policy, Version 2.3, effective 3 December 2020 (education.wa.edu.au), and Department of Sport and Recreation, Guide to shared use facilities in the sport and recreation community, date not shown, accessed 14 Nov 2026 (dlgsc.wa.gov.au).

  • The policy says arrangements for third-party use must not adversely affect the safety or welfare of students and school employees, and must not interfere with the normal operations of the school.
  • The guide suggests locating shared buildings on the edge of the school site where possible, so they are visible and accessible to the public. It also suggests clearly defined public access points kept apart from the more secure school access, design flexibility to separate students from the public when activities run at the same time, enough secure storage for all users, and materials suited to multiple uses.

Sport England hall guidance summary

Sources: Sport England, Sports halls guidance page, date not shown, accessed 14 Nov 2026 (sportengland.org); Sport England, Sports Halls Design and Layouts, Revision 005, February 2012 (PDF).

  • Hall size. Sport England has revised the four-court hall from 33 x 18 metres to 34.5 x 20m. It says programmes for governing-body-compliant community participation through to club competition "need the hall to be 34.5 x 20m or larger". The 2012 guide recommends a minimum of 34.5 x 20.0 x 7.5m for school projects.
  • Levels of play. Halls are planned for one of four levels: International, Premier, Club or Community. "Community" covers school and community use where there is no formal competitive structure and no specific need for officials or spectator space.
  • Programme-led planning. Developing the Right Sports Hall, produced with the governing bodies for badminton, basketball, cricket, netball and volleyball, encourages halls to be programme-led and developed in partnership with governing bodies, local clubs and schools, using standard hall sizes so as many sports as possible can use the hall.
  • Storage. At least 12.5 per cent of the hall floor area is needed for sports equipment storage. "Community use school halls and large events halls may require more for furniture and specialised fittings."
  • Acoustics. The guide describes acoustic design as "a complex and specialist subject" whose requirements should be set early in briefing and design. It refers to England's school acoustic regulations, so for a New Zealand school the DQLS Acoustics requirements above are the relevant equivalent.
  • Village and community halls. Sport England also publishes guidance for multi-purpose community halls that host recreational physical activity alongside "social, cultural, and artistic pursuits".

NZ Building Code and MoE standards compliance review

Sources: Building Regulations 1992, Schedule 1 (the New Zealand Building Code), version as at 15 January 2026 (legislation.govt.nz); Building Act 2004, section 118 and Schedule 2, version as at 8 October 2026 (legislation.govt.nz); NZSPA design requirements pages, dates as shown below.

This list names the Code clauses and school property standards that would usually come up for a school hall. It does not test any design against them.

Building Code clauses

  • B1 Structure and B2 Durability. Buildings must withstand the loads they are likely to experience throughout their lives. Structural elements must last at least 50 years with normal maintenance, and moderately hard-to-replace elements, including the building envelope, at least 15 years.
  • C Protection from fire (C1 to C6). The objectives are to safeguard people from fire, protect other property and help firefighting and rescue.
  • D1 Access routes. Buildings need safe and easy access. At least one access route must let disabled people approach the building, enter it and reach the spaces they would be expected to use, including toilets.
  • E2 External moisture. Buildings must resist penetration and accumulation of moisture from outside. Roofs must shed rain.
  • F7 Warning systems. Buildings must have an appropriate means of warning people to escape to a safe place in an emergency.
  • G4 Ventilation. Spaces must have adequate ventilation for their maximum occupancy and intended use.
  • G5 Interior environment. G5.3.5 requires listening systems for people with hearing aids in "any theatre, cinema, or public hall" and in communal non-residential assembly spaces for more than 250 people.
  • G6 Airborne and impact sound. G6 covers noise passing between occupancies into household units, so it would not usually be the acoustic standard for a school hall. Hall acoustics are set by DQLS Acoustics (above).
  • H1 Energy efficiency. The requirement for energy-efficient artificial lighting applies to commercial and communal non-residential buildings over 300 m². The heating, cooling and ventilation requirement H1.2(a) does not apply to buildings classed as assembly service buildings.
  • Access for disabled people (Building Act 2004, section 118 and Schedule 2). Public buildings must make reasonable and adequate provision for access, parking and sanitary facilities for disabled people. Schedule 2 lists schools, including intermediate schools, and places of assembly, including halls and recreation centres.

NZSPA (formerly Ministry of Education) school property standards

  • DSNZ (March 2026) is the overarching set of design standards, mandatory for new builds on state school property (see the joint-use block above).
  • DQLS covers acoustics (V3.1 2020, amended May 2024), lighting and visual comfort (V2.1 2020), and indoor air quality and thermal comfort (V2.0 2022). NZSPA says schools must meet both Building Code clause G4 and DQLS ventilation requirements.
  • Fire and Safety Design Requirements for Schools ("the fire policy"), dated 2008 with addendums from July 2017 and June 2018. It covers building design, fire alarms, sprinklers, separation distances and maximum firecell size, and NZSPA notes some of its requirements "may be in addition to minimum building code requirements".
  • Weathertightness Design Requirements for School Buildings, Version 3.2 (October 2025). These apply to all new state school buildings, extensions and exterior alterations. They add school-specific requirements beyond the Building Code, including increased roof pitch, drained and ventilated wall cavities, spouting requirements and increased cladding durability.
  • Structural and geotechnical requirements and the Toilet and changing space design standards for schools are also part of the DSNZ suite. The Wesley Intermediate designation includes a site-specific geotechnical condition for the Central Auckland Specialist School development.
  • Consent for community-funded projects. NZSPA says boards must apply for consent before using board or community funding to build, upgrade or buy property. It assesses education benefits, network considerations, financial status and property standards.
  • Third-party use. Under sections 162 and 163 of the Education and Training Act 2020, a hall can be used by community groups under a casual use agreement if the use is non-exclusive and within set limits, for example a term of 7 weeks or more with use of less than 15 hours per week. Other uses need a lease or licence consented by the NZSPA Board. NZSPA's example: "a karate club using the school hall on Tuesday evenings, and the school using it the rest of the time."

All statements on this page carry their named source. Original wording is kept when updates are made. This page is a living record of the concept and will be updated as each stage is completed.

Primary sources only. Not a lodged proposal.

FAQ

What is proposed?
The proposal is for a flexible hall on the Wesley Intermediate site that can serve multiple schools during the day and open to community use for indoor sport, performing arts, cultural events and gatherings. The aim is better use of an existing school site and more places for people in Mt Roskill and nearby areas to be active and come together.
How would the multi-use hall work?
The concept shows one hall working in four modes: three basketball courts; two courts plus a practice zone; match mode with retractable spectator seating; and performance and assembly mode with a portable stage, acoustic curtains and theatrical lighting. The images are conceptual illustrations only, not site-specific designs for Wesley Intermediate.
Is a prefabricated steel hall a cost-effective option?
Prefabricated steel portal-frame halls on a concrete slab are a widely used, cost-effective way to enclose a large single-storey space. Published reference figures include Creo Space's New Zealand supplier pricing from $630,000 + GST for a fully enclosed single-court hall and from $1.2 million + GST for a double-court hall, and Sport England's 3Q2025 figure of £3,005,000 for a 4-court hall. These are reference figures only, not a cost estimate for Wesley Intermediate.
What is its status?
Stage 1, Concept confirmation, is recorded as In progress – CBA engaged by local group. The next step recorded is: Lock internal concept note and publish this page.
Who is it for?
The project page does not name a single audience. It lists these ways to be involved: School use; Sport; Performing arts; Community gatherings.
How can I take part?
Use the expression of interest or the short survey under How to take part. Both are opt-in and record your consent before a response is saved.
Is this a petition or a formal submission?
No. Thanks. Your response is opt-in and is used only to refine the concept. It is not a petition or a formal submission.